Richmond Layover Facility

The Richmond Layover Facility will provide an overnight storage and servicing facility in the Richmond Metropolitan area to support existing and future passenger rail service between Richmond and Washington, DC. The new facility will be located in the existing CSX Fulton Yard, south of Williamsburg Road and east of the James River.

Document Library

View and download project documents

EVENT

More details to follow

Project Description

The project includes the planning, design, permitting, and construction of a Layover Facility and tracks for the storage and light servicing of existing Amtrak trains serving Main Street Station that are currently stored at the Staples Mill Station. It will also service future trains that will begin service at the end of Phase 1 and Phase 2 in 2026 and 2030. This project is required as part of the Rail Agreement with CSX, as it will reduce rail congestion in and near CSX’s Acca yard between Staples Mill and Main Street Stations. VPRA is working with CSX, Amtrak, and others to conduct environmental clearance and preliminary design for the facility.

The project includes (but not limited to) the following improvements:

  • Storage tracks
  • Maintenance platform(s) and Amtrak amenities
  • Signaling
  • Roadway improvements for site access
  • Staff parking
  • Trailers for staff facilities
  • Storage containers for equipment

This project will improve service reliability as well as station access and customer convenience by reducing the current deadhead moves that are delayed by conflicts with freight operations.

Project Stage

Environmental Clearance and Permitting, and Preliminary Design – Summer 2023 – Winter 2024

Feasibility Study – Completed Spring 2023

Environmental Clearance and Permitting, and Preliminary Design – Summer 2023 – Winter 2024

Document Library

Fact Sheet (English) – Winter 2024

Fact Sheet (Spanish) – Winter 2024

Feasibility Study – Completed Spring 2023